Confcall-prot-22jul05

From GEANT2-JRA1 Wiki

Contents

Agenda

  1. Review of actions.
  2. Review of prototype phase 0 progress.
  3. Preparations for phase 0 demo.
  4. Workplan for prototype development meeting in Paris.

Minutes

Attendees

David Schmitz (DFNm)
Andreas Hanemann (DFNm)
Loukik Kudarimoti (DANTE)
Szymon Trocha (PSNC, scribe)
Roman Łapacz (PSNC)
Maciej Głowiak (PSNC)
Giorgos Pallas (GRNet)
Martin Swany (UoD)

Discussion

Actions from last phone call

  • RL
    1. Look at JB work to make changes in his part if necessary.
    2. To work with GP on creating ant file for running CLI client. - DONE
    3. Complete work on Service Engine implementation along with LK.
    4. Discuss and change naming convention in service properties file.
    5. Integration and tests of RRDinterface and config file.
    6. Discuss exceptions and put necessary changes into RRD access classes. - DONE
  • LK
    1. Install RRDtool on Solaris workstation in DANTE.
    2. Integration and tests of RRDinterface and config file.
    3. Discuss exceptions and put necessary changes into RRD access classes. - DONE
    4. Work on MA Service Engine logic based on this class structure along with RL.
    5. Work on Request Handler to do SAX parsing with defined content handlers.
  • JB
    1. Make the changes necessary for the message handler.
    2. Set up conf call on I2 MCU about integration of message handler and ServiceEngine.
    3. Look into client specifications on the wiki and see if they are ok for phase I.
    4. Work on the message taxonomy and determining how that fits in with a class decomposition.
    5. Create additional message handlers to deal with additional message types.
    6. Work on the MetadataKey issue and how that fits (with MS and JZ).
  • GP
    1. Update CLI client and commit changes in CVS. - DONE
    2. Send screenshots of CLI tool output and send it to the mailing list. - DONE
    3. Work on client interface specification (CLI and CNM) according to prototype phases togehter with ST and DS. - ongoing
  • MS
    1. Work with JB on message taxonomy.
    2. Comment on package structure.
    3. Config file: work on parsing config files.
  • ST
    1. Come up with topics to discuss during development meeting in Paris. - DONE
    2. Work on client interface specification (CLI and CNM) according to prototype phases together with GP and DS. - ongoing
  • DS
    1. Work on client interface specification (CLI and CNM) according to prototype phases togehter with ST and GP. - ongoing
  • MG
    1. Take CVS snapshot, integrate and try to retrieve data from DANTE Solaris workstation.

Conf call ended at 15:50 CEST.

Download to listen to this conf call


Back to JRA1 events

Personal tools