GLS-16-July-2008
From GEANT2-JRA1 Wiki
[edit]
Attendees
- Nina Jeliazkowa
- Nicolas Simar
- Maciej Głowiak
- Michael Bischoff
- Szymon Trocha
[edit]
Agenda
- API* status
- Mostly done. Discovery works for eventTypes. Topology elements need some additional work to support different elements (to be done today)
- Polishing of class names needed
- Finalized this week
- psUI implementation status
- Use of gLS ready for the demo in Berlin but rather linked to RRD MA
- Incorporating API level0 should be quite easy while level1 and 2 needs investigation (e.g. if additional parsing is needed) of the code provided by MB
- gLS implementation status
- Working with summarisation of IP addreses based on Martin's code and /32 and for domains.
- Self-tests ready
- Next RC on Thursday, 17 July
- Test infrastructure status
- Ready with 4 hLS and 4 RRD MAs. Summarisation works but an issue with eXist. Still needs investigation. NS: look at eXist forums for some help
- When a new RC is out re-install services
- Next steps
- Covered in actions
[edit]
Actions
Actions from previous conf calls - still some on-going there or not done
- MB to finish API implementation this week and then let Nina now when it's done
- NJ to investigate the complexity of APIs integration with psUI (when finished by MB)
- ST to update Test_Infrastructure wiki page with working services needed for testing (for Sasa) - DONE - hLS test instance provided for Sasa. Still need to update Wiki
- MG to provide a new gLS RC (including self-tests, IP summarisation) for Thursday, 17 July -DONE
- All to use full domain names in metadata configuration files
- ST to check the status of gLS tests doing by Prodromos - DONE - No answer received but Prodromos contacted directly with MG
- MG to send information about the current content of gLS for 3.1 and what will be done in future with new pSbase - DONE
- MG to send to NS where full domain names needs to be changed in metadata configuration file - DONE
- ST to verify services documentation and specify where to configure full domain names - not done yet
- MG to investigate MB's proposal of changes into eXist (sessions) - partially DONE - implemented but not investigated,
- All - next call on Wednesday, 23 July 11:00 CEST, Skype
Back to JRA1 events
