MDM perfSONAR 3.0 Conf call 24 Apr 2008
From GEANT2-JRA1 Wiki
Date and Time: Thursday, the 24 of April 2008, 15:00-16:00 CEST, 14:00-15:00 GMT+1.
We will use the Hungarnet MCU, * GDS numbering plan JRA1: 0036100309901 * Phone access: +36 1 450 3099 then type the GDS number 0036100309901
Backup DFN * GDS dialstring: 004910091212314***4522 * To connect by phone, see: 0049 30 254 10800 - The dialstring here is also 004910091212314***4522. **https://www.vc.dfn.de/doku/anleitungen/isdn_gateway.html?lang=en * Note: you can´t use it with NAT, unless you use a NAT proxy.
Expected participants: Luís Marta, Nicolas Simar, , Guilherme Fernandes, Cándido Rodríguez Montes, Maciej Glowiak, Roman Lapacz, David Schmitz, Patricia Marcu, Panagiotis Prokopiou, Szymon Trocha, Jeff W. Boote, Prodromos Gerakios, Maxim, Stijn Melis.
Apologies: Michael Michalis, Loukik Kudarimoti, Jochen Reinwand, Sasa Cavara, Verena Venus.
Relevant Documents:
- Timeline for MDM-perfSONAR 3.0 Bundle release
- MDM-perfSONAR 3.0 Bundle product specification
- Hand-Over Process description
- Product Build Guide document
- MDM perfSONAR 3.0 Test status
- Test Infrastructure
- Bug Reports on Bugzilla
- Holidays
- PerfSONAR_v3.0_filenames
[edit]
Agenda
- Developer status update on Hand-over of software and all specification documents and change logs:
- Stijn - SSH-Telnet MP
- Documents and change log on SVN trunk
- Software - 1.3-RC5 is out (rpm package) and is the final RC. Is it already installed in test infrastructure?
- Time to deliver war files and deb packages?
- Testing Update (Panagiotis) - Tests completed and signed off by Test Lead.
- Candido - Authentication Service
- Documentation and change log available on SVN trunk
- Software - 1.0-RC8 is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages?
- Testing update (David and Patricia) - Tests completed and signed off by Test Lead.
- Maciej - Single LS
- Documentation and change log available on SVN trunk
- Software - 1.2-RC7 is is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages?
- Testing update (Prodromos) - Tests completed and signed off by Test Lead.
- Roman - RRD MA
- Documentation - All documents and change log on SVN trunk
- Software - 3.0-RC9 is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages?
- Testing update (Michalis) - Tests completed and signed off by Test Lead.
- Testing - Performance
- ACTION ONGOING Roman to read test reports and comment on them.
- Roman - SQL MA
- Documentation - All documents and change log on SVN trunk
- Software - 2.0-RC10 was out today (rpm package with web admin jar 0.8.4b) and should be the final RC. Is it already installed in test infrastructure?
- Time to deliver war files and deb packages?
- Testing update (Sasa Cavara) - scripts are ready. Time to finish testing?
- Verena - BWCTL MP
- Documentation and change log available on DFN Erlangen SVN
- Software - 0.4-RC5 is out (rpm package) and is the final RC. Is it already installed in test infrastructure?
- Time to deliver deb packages?
- WebAdmin tool rework is done and signed off.
- Testing update (Stijn) - Tests completed and signed off by Test Lead.
- Guilherme - CLI MP
- Documentation and change logs available on SVN trunk
- ACTION ONGOING: Update documentation to reflect new message type ErrorResponse - Szymon to check this.
- Software - CL-MP 2.0-RC5 still being expected, time to make it available (rpm, deb packages and war files)?
- Testing (Jochem) - Finished testing RC4 - expected time to test RC5?
- Documentation and change logs available on SVN trunk
- Jeff and Jason - perfSONOBuoy
- Documentation - Service documentation is finished.
- Software - development complete.
- RPM installation - MDM packaging in progress.
- web-admin interface - webAdmin development - complete, it largely works, but does not yet match the other services look-n-feel. Jason is working on abstracting that part into style-sheets and templates.
- Testing - Service testing complete.
- Maxim and Yee - Pinger
- Documentation:
- Software - PingER is ready, Web admin is almost ready. For installing, executables will be available, in addition to RPMs. EXE will install anywhere the user wnats, RPMs are being changed to install in \opt\ folder.
- Stijn - SSH-Telnet MP
- AOB
- Next call
[edit]
Minutes
Participants: Luís Marta, Nicolas Simar, Cándido Rodríguez Montes, Maciej Glowiak, Roman Lapacz, David Schmitz, Panagiotis Prokopiou, Stijn Melis.
- Developer status update on Hand-over of software and all specification documents and change logs:
- Stijn - SSH-Telnet MP
- Documents and change log on SVN trunk
- Software - 1.3-RC5 is out (rpm package) and is the final RC. Is it already installed in test infrastructure?
- Time to deliver war files and deb packages? - war files are done, deb packages will be when package maker is available.
- Testing Update (Panagiotis):
- in the AuthN part of the WebAdmin for the SSHTELNET MP, the yes option corresponds with AuthN off, and the No option corresponds to AuthN on. Stijn just has to switch these, and this will be fixed.
- About Bug 419: this is due to the new naming conventions which were just announced. rpm was remade, and it now is geant2-java-sshtelnet-mp-1.3RC5-2.noarch.rpm and it should install the MP in /opt/perfsonar/services/geant2-java-sshtelnet-mp, so this is fixed.
- There is a problem connecting to eXist in an installation that used a war file, Stijn is going to investigate if that problem is also present in RPM installation or not, and if this is a problem on the MP.
- Tomorrow neither Stijn nor Panagiotis are available, so only monday can a possible new RC come out and be tested.
- Candido - Authentication Service
- Documentation and change log available on SVN trunk
- Software - 1.0-RC8 is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages - war files tomorrow, deb packages will be when package maker is available.
- Testing update (David and Patricia) - Tests completed and signed off by Test Lead.
- Maciej - Single LS
- Documentation and change log available on SVN trunk
- Software - 1.2-RC7 is is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages?
- Testing update (Prodromos) - Tests completed and signed off by Test Lead.
- Roman - RRD MA
- Documentation - All documents and change log on SVN trunk
- Software - 3.0-RC9 is out (rpm package) and is the final RC. Already installed in test infrastructure.
- Time to deliver war files and deb packages - war files are available for all three architectures, and deb packages will be when package maker is available.
- Testing update (Michalis) - Tests completed and signed off by Test Lead.
- Testing - Performance
- ACTION ONGOING Roman to read test reports and comment on them.
- Roman - SQL MA
- Documentation - All documents and change log on SVN trunk
- Software - 2.0-RC10 was out today (rpm package with web admin jar 0.8.4b) and should be the final RC.
- Time to deliver war files and deb packages - war files are available, deb packages will be when package maker is available.
- Testing update (Sasa Cavara) - scripts are ready. Sasa finished with success all tests for the newest (RC10) SQL MA release. Had some trouble with the tests, that were complete today around noon.
- Verena - BWCTL MP
- Documentation and change log available on DFN Erlangen SVN
- Software - 0.4-RC5 is out (rpm package) and is the final RC. Is it already installed in test infrastructure?
- Time to deliver deb packages?
- WebAdmin tool rework is done and signed off.
- Testing update (Stijn) - Tests completed and signed off by Test Lead.
- Guilherme - CLI MP
- Documentation and change logs available on SVN trunk
- ACTION ONGOING: Update documentation to reflect new message type ErrorResponse - Szymon to check this.
- Software - CL-MP 2.0-RC5 still being expected, time to make it available (rpm, deb packages and war files)?
- Testing (Jochem) - Finished testing RC4 - expected time to test RC5?
- Documentation and change logs available on SVN trunk
- Jeff and Jason - perfSONOBuoy
- Documentation - Service documentation is finished.
- Software - development complete.
- RPM installation - MDM packaging in progress.
- web-admin interface - webAdmin development - complete, it largely works, but does not yet match the other services look-n-feel. Jason is working on abstracting that part into style-sheets and templates.
- Testing - Service testing complete.
- Maxim and Yee - Pinger
- Documentation:
- Software - PingER is ready, Web admin is almost ready. For installing, executables will be available, in addition to RPMs. EXE will install anywhere the user wnats, RPMs are being changed to install in \opt\ folder.
- Stijn - SSH-Telnet MP
- AOB - none
- Next call - no next call
