Meeting-Paris-24jul05
From GEANT2-JRA1 Wiki
Contents |
[edit]
Venue
RENATER ENSAM
151 boulevard de l'Hôpital
75013 Paris
[edit]
Attendees
- Loukik Kudarimoti (DANTE)
- Giorgos Pallas (GRNet)
- Maciej Głowiak (PSNC)
- Szymon Trocha (PSNC)
- Martin Swany (UoD)
- Andreas Hanemann (DFNm)
- David Schmitz (DFNm)
- Jerome Durand (RENATER)
[edit]
Goals
- Development collaboration in order to demonstrate working prototype phase 0.
- Check that the communication and mmodules implementation is working in practice.
- Work on Lookup Service design.
- Work on integration of visualisation with prototype phase I.
[edit]
Conf-call information
Gatekeeper: pgk.vc.dfn.de (for non-GDS members)
- GDS number: 004910091212314***4522
[edit]
Workplan
[edit]
Day 1, 25 July
[edit]
Agenda
9-18:30
- Current status summary
- Work on Lookup Service detailed design
- Schema
- Information structure
- Database
- RRD Measurement Archive service implementation
[edit]
Summary
- Lookup protocol -- Lookup protocol is described in Lookup Service Implementation document
- LS Database - to compare -- described in Data storage possibilities for LS
- XML database (eXist, Berkley DB XML)
- SQL database (MySQL, PostgreSQL)
[edit]
Actions
- (MG): Test different type of databases (until 5 Aug and decide then). Support from MS
- (all): Start Lookup Service design (when prototype phase 0 is completed).
[edit]
Day 2, 26 July
[edit]
Agenda
9-17
- Discuss specification of CLI client and GUI.
- Discuss workplan for integration of GUI with the framework.
- Implementation practices.
- Wiki structure (how to put design details, improve readability).
[edit]
Summary
- Different types of clients will make use of the framework sharing the same classes.
- We need both CLI client and CNM tool developed in parallel.
- Next step for CLI client is to talk with Lookup Service.
- JRA web pages
- Should act as an interface between us and users.
- DANTE official web server should include basic project information with pointers to Wiki pages.
- Wiki pages should be restructured in order to better show the information to wider audience and to JRA1 partners.
- Distinguish between under discussion part and where decision was already taken.
- DANTE Wiki server no earlier then end of 2005.
- Include pointers on WIki to other monitoring data.
- Use Dia tool to draw UML diagrams.
- Use PDF and PNG format.
[edit]
Actions
- (ST,NS): Contact with EB about project Web structure maintaining.
- (LK): Send information about current status of Wiki server in DANTE.
- (JD): Take care of JRA1 Wiki web pages, improve structure, look at other project pages.
- (JD,NS): Update information on JRA1 DANTE web page.
- (all): Send to the mailing list their experiences with development work.
- (ST): Organize conf call regarding development pracitcies when phase 0 is completed to prepare the guidelines.
- (all): Come up with development guidelines before the development meeting in Poznan.
- (MS,RL,GP,LK,JB): Make phase 0 documentation up-to-date. Breakdown and update class diagrams, message flows and put it in one place.
- (LK): Sent out a sample of UML diagram to mailing list.
Back to JRA1 events
