Meeting-Paris-24jul05

From GEANT2-JRA1 Wiki

Contents

Venue

RENATER ENSAM

151 boulevard de l'Hôpital

75013 Paris

Attendees

  1. Loukik Kudarimoti (DANTE)
  2. Giorgos Pallas (GRNet)
  3. Maciej Głowiak (PSNC)
  4. Szymon Trocha (PSNC)
  5. Martin Swany (UoD)
  6. Andreas Hanemann (DFNm)
  7. David Schmitz (DFNm)
  8. Jerome Durand (RENATER)

Goals

  1. Development collaboration in order to demonstrate working prototype phase 0.
  2. Check that the communication and mmodules implementation is working in practice.
  3. Work on Lookup Service design.
  4. Work on integration of visualisation with prototype phase I.

Conf-call information

Gatekeeper: pgk.vc.dfn.de (for non-GDS members)

  • GDS number: 004910091212314***4522

Workplan

Day 1, 25 July

Agenda

9-18:30

  1. Current status summary
  2. Work on Lookup Service detailed design
    • Schema
    • Information structure
    • Database
  3. RRD Measurement Archive service implementation
Summary
Actions
  1. (MG): Test different type of databases (until 5 Aug and decide then). Support from MS
  2. (all): Start Lookup Service design (when prototype phase 0 is completed).



Day 2, 26 July

Agenda

9-17

  1. Discuss specification of CLI client and GUI.
  2. Discuss workplan for integration of GUI with the framework.
  3. Implementation practices.
  4. Wiki structure (how to put design details, improve readability).


Summary
  • Different types of clients will make use of the framework sharing the same classes.
    • We need both CLI client and CNM tool developed in parallel.
    • Next step for CLI client is to talk with Lookup Service.
  • JRA web pages
    • Should act as an interface between us and users.
    • DANTE official web server should include basic project information with pointers to Wiki pages.
    • Wiki pages should be restructured in order to better show the information to wider audience and to JRA1 partners.
    • Distinguish between under discussion part and where decision was already taken.
    • DANTE Wiki server no earlier then end of 2005.
    • Include pointers on WIki to other monitoring data.
  • Use Dia tool to draw UML diagrams.
    • Use PDF and PNG format.
Actions
  1. (ST,NS): Contact with EB about project Web structure maintaining.
  2. (LK): Send information about current status of Wiki server in DANTE.
  3. (JD): Take care of JRA1 Wiki web pages, improve structure, look at other project pages.
  4. (JD,NS): Update information on JRA1 DANTE web page.
  5. (all): Send to the mailing list their experiences with development work.
  6. (ST): Organize conf call regarding development pracitcies when phase 0 is completed to prepare the guidelines.
  7. (all): Come up with development guidelines before the development meeting in Poznan.
  8. (MS,RL,GP,LK,JB): Make phase 0 documentation up-to-date. Breakdown and update class diagrams, message flows and put it in one place.
  9. (LK): Sent out a sample of UML diagram to mailing list.

Back to JRA1 events

Personal tools