WIL Conf call 18 December 2007
From GEANT2-JRA1 Wiki
Contents |
[edit]
Meeting details
Date and Time: Friday, the 18th of December 2007, 11:00 - 12:30 CET, 10:00-11:30 BST.
Skype
[edit]
Actions
- SK to investigate why the BWCTL MP tests don't work with the MDM Pilot. To check with perfSONARUI plug-in
- NS to check the timeline or LIPCU (for ordering the kits and scheduling the workload)
- ST to add in the document the details as which ps-base to go for or which schema version.
- AH: Exchange utilisation range (color) Evaluate: how the visualisation could cope with that change (+ ressource estimate)
- NS find out who has constrains on providing utilisation data.
- NS to plan the end of the Pilot
- NS to draft a prototype plan
- NS to start setting up the quotes for Prototype and LHC-OPN
- LK to follow-up on the starting date for the LHC-OPN activity.
- SK to investigate if we can get RH support after having modified the kernel
- LK to indicate when the release 3.0 will be available. NS to contact PW about training schedule.
- LK to send a summary about issues relater to 3.0 and on-time parts.
- SK to send an email about the traceroute : where are they visualised. Which ones are available?
[edit]
Minutes
- Last Meeting Actions - See Below
- EC report, no particular mention made about perfSONAR and the transition to service. This means we are doing good (but also that we can improve to be remarked with a "good score").
- Issues
- Andreas : DFN cannot share values. They can only share pre-defined ranged of utilisation (to anybody). The information must be exported by the MA.
- Evaluate: how the visualisation could cope with that change (+ ressource estimate). Who makes the changes on the MA (DFN - the NOC doesn't have much ressources for it; transformation service: JRA1 doesn't have this service in its pipeline so far)
- Might have some benefits for other NRENs which don't want to provide that information. Who else has that constrain?
- ST: How to get further with MDM?
- Plans for the end of the Pilot and the beginning of the prototype is needed. Leave a break between the Pilot and the prototype.
- ST: when starts the LHC-OPN activity?
- LK: deployments and redHat 5.0
- Push Meinberg or redHat
- LK 3.0
- Training is scheduled mid-March. Need postponing
- Issues with Telnet/SSH MP and with BWCTL MP
- AA tests = Partricia and David involved.
- LK and traceroute
- where are they stored and where are they represented
- NS RRD MA
- no profiling done. ST: wait for Ilias scripts.
- Andreas : DFN cannot share values. They can only share pre-defined ranged of utilisation (to anybody). The information must be exported by the MA.
[edit]
Agenda
- Last Meeting Actions
- EC Review report
- Current Issues (all to prepare a list)
- Deployment issues
- Utilisation categories - AH
- Security
- JRA1 demo at plenary
- Rome sessions organisation
- Tuesday 09:00 - 10:30 - AA/eduGAIN (CR, NS, web-servi develop?, GUI developer?)
- Tuesday 13:00 - 17:30 - cNIS v1 developer meeting (DS/PM, NS, JK, DM?)
- Wednesday 09:00 - 13:00 - Plenary (JRA1 demo - who?) ; attendance (who?)
- Wednesday 14:00 - 15:30 - JRA1-PERT progress, demo (who: AI, GC, NS, CW)
- Wednesday 16:00 - 17:30 - JRA1-JRA2 (netflow progress, set-up a document template to submit to TF-CSIRT, netflow deployment) (NS, HT, AI, JKH)
- Thursday 09:00 - 13:00 - Cross activities (monitoring, ticket, statistics, users, training) (NS, LK, ??)
- Thursday 09:00 - 18:00 - JRA1 meeting (someone to lead and organise session, session animation)
- Friday 09:00 - 13:00 - TC Meeting (NS)
- Friday 09:00 - 13:00 - JRA1 meeting (Someone to lead, session animation)
- Priority Action Plan - identify our priorities for the next 6 months
- NOC and PERT requirements
- Change process
- Documents needed for perfSONAR
- Gina
- protocol
- Product contact information - Primary dev, Backup dev and QA/team leader
- MDM-perfsonar release
- Next perfSONAR meeting
[edit]
Last Meeting Actions
- NS to try the BWCTL plug-in. - Not working
- WIL to evaluate EB's proposal for packaging software. - Done
- ST to get confirmation that the reutilisation of ps base is clear to everybody. Can be done through pS3.0 specs. - Done
- NS to check with Baiba about who in Latnet is involved - - Possible actions: move manpower to another NREN: Ugent, Arnes. Work on SNMP MP, TrS, QoS metric into RRD MA. Can left 3PM to Latnet for Network engineers to try things out. AH not favourable
- NS to ask JM and LHC to specify who are the users of those data so that we can tailor the visualisation.
- NS to coordinate the development side for ps3.0 - release management follow this up
- LK to provide a plan for release and testing. - Done
- NS to schedule a conf call with the developers for release 3.0 (1st of October) - Done
- ST to add in the document the details as which ps-base to go for or which schema version.
- LK to check that pSbase has all the feature required.
- WILs to identify topics for the Rome meeting. - Done
- NS to as a general question about the topic to the ML.- Done
- AH (feature for visualisation and users), LK (service desk features) to attend cNIS meeting (10th of October, Cambridge)- Done
- NS to attend cNIS meeting via VC.- Done
- AH, LK and NS to organise themselves for the cNIS meeting- Done
- LK to coordinate the deployment of the GEANT RRD MA (restricted to MDM participants)